PROGRESS ENERGY FLORIDA: Levy County Baseload Transmission Project Acquisition Program Manager – Crystal River Nuclear Power Plant.

FLAA, as a large acquisition project provider, and LPA Group, as its partner on this project, were selected to manage, direct, survey and acquire the necessary easement and fee simple rights on this 200-mile, 2,000 parcel acquisition project. The project was to acquire about 2,000 parcels or more for this 230-500kV electric power transmission project from the newly proposed Crystal River Power Plant in Levy County. The line was sited through Levy, Citrus, Sumter, and Marion Counties and through Polk, Hillsborough Pinellas, and Osceola Counties. FLAA was the backbone of the right of way team, support management and subconsultant survey management and worked significantly with all team members.