TALQUIN ELECTRIC: Buck Lake-Chaires Reliability Project (2021-2022).

FLAA was selected to negotiate and acquire, by donation and/or voluntary settlement, 30ft to 100ft easements from approximately 50 property owners. The route generally followed an existing distribution route along Chaires Cross Road, from Buck Lake Road to Apalachee Parkway (US27). The approximately 4-mile corridor replaced existing wooden structures with 115kV concrete poles while raising the line height for better access and unobstructed views.